Project Requirements

Aquatec’s solution included a booster pump station, smaller duty pumps for residential flows, a back up generator, install of a new shed and the associated electrics.


Aquatec’s Water Supply Systems maintain consistent water pressure to users from mains outlets to meet Water Authority or Council specifications.

Project Requirements

Key Highlights

Aquatec audited each phase of the project to ensure it conformed to the Water Authority North East Water’s specifications.

• During the commissioning phase, Aquatec technicians provided full training to the operators of the Water Authority and provided a full operation & maintenance manual on how to run, operate and maintain the system.
• Aquatec conducted a Factory Acceptance Test (FAT) with North East Water in attendance prior to the switchboard coming to site to ensure all components fully conformed to the specifications.
• The pump system was commissioned via generator; exceeding the expectations of the pump duty design and fully conformed to North East Water’s latest specifications

Key Highlights