Managing Site Restrictions

Navigating a narrow site with street frontage

 


The site identified for the new pump station presented on a tight parcel of land fronting a nature strip between residential properties and a roadway. Aquatec’s design solution exceeded the original design intent and assumptions.

 

Our pump station achieved a smaller overall footprint with the inclusion of our exclusive internal valve chamber while achieving an improved aesthetic for surrounding residents. The installation process became easier to navigate on this narrow site as will maintenance for access purposes in the future.

Managing Site Restrictions

Local Manufacturing

With local design innovations
Aquatec locally manufactured and delivered a 3.2 diameter , 6.4 metre deep mould-formed Concrete Sewer Pump Station for the Chinchilla township.

The design features an integral valve chamber engineered to eliminate the line-up of separate valve chambers for a smaller footprint. A mastic sealant applied to all joins provides a guaranteed seal to protect the asset from future leaks into the surrounding residential environment.

Local Manufacturing

Aquatec were appointed to install a new Concrete Pump Station